Wowgnomes
|
  |
| Joined: 27 Sep 2009 |
| Total Posts: 26255 |
|
|
| 13 Feb 2017 04:52 PM |
1. I want minimalist build style, meaning simple, not very detailed mostly textures/big bricks but neat and not messy
2. I want mining tycoon, don't worry about scenery etc just the actual tycoon.
3. Would be similar to this, obviously more stuff and better built. want retro vibe tho, so studs where it's applicable. just to give an idea of era. it's modern and there would be futuristic upgrades at the end:
4. link me when you have ~5-10 minutes of work done so I can evaluate and let you know if I want you to continue building.
5. PM me or post how much you would want, please note that this is meaningless without a sample of the build from step 4.
https://www.roblox.com/games/653025761/Wowgnomess-Place-Number-92
|
|
|
| Report Abuse |
|
|
BennVIII
|
  |
| Joined: 27 Oct 2016 |
| Total Posts: 31 |
|
|
| 13 Feb 2017 04:58 PM |
The sample place is unanchored
|
|
|
| Report Abuse |
|
|
Wowgnomes
|
  |
| Joined: 27 Sep 2009 |
| Total Posts: 26255 |
|
| |
|
iiVoidify
|
  |
| Joined: 02 Dec 2012 |
| Total Posts: 16 |
|
|
| 13 Feb 2017 07:20 PM |
Just the Build correct? I may be interested. I can not script
|
|
|
| Report Abuse |
|
|
iiVoidify
|
  |
| Joined: 02 Dec 2012 |
| Total Posts: 16 |
|
|
| 13 Feb 2017 07:21 PM |
Also is that is a undetailed sample? I can work just pm me when to start.
|
|
|
| Report Abuse |
|
|
Wowgnomes
|
  |
| Joined: 27 Sep 2009 |
| Total Posts: 26255 |
|
|
| 13 Feb 2017 07:43 PM |
"4. link me when you have ~5-10 minutes of work done so I can evaluate and let you know if I want you to continue building.
5. PM me or post how much you would want, please note that this is meaningless without a sample of the build from step 4."
|
|
|
| Report Abuse |
|
|
|
| 13 Feb 2017 08:53 PM |
| gnomes, you tell me your budget, and my group'll see if they can build it for you? |
|
|
| Report Abuse |
|
|
Wowgnomes
|
  |
| Joined: 27 Sep 2009 |
| Total Posts: 26255 |
|
|
| 13 Feb 2017 10:08 PM |
" 4. link me when you have ~5-10 minutes of work done so I can evaluate and let you know if I want you to continue building.
5. PM me or post how much you would want, please note that this is meaningless without a sample of the build from step 4."
Can't give you a quote without seeing any work...
|
|
|
| Report Abuse |
|
|